Experience &
Employment History:

Small World

 

My Clients and my work history:

Extensive International Construction Management experience gained at various projects in the field of fabrication, on-site fabrication, heavy lift, erection and commissioning. Personally developed or managed development of numerous methodology statements and approaches in the area of mechanical construction, fabrication and erection. Extensive site experience and track record of working successfully in different parts of the world.

At present:
KONECRANES Finland Corporation, www.konecranes.com

Teluk Lamong Terminal -Surabaya -Indonesia.
Erection Site Manager P-III - Final at site erection, commissioning
and testing-Hand-over to Client of;
- 3 units Ship to Shore Cranes STS 40T cap.
- 2 units Ship to Shore STS 60T cap.
- 5 units Straddle Carrier 40T cap.
-10 units Automated Stacking Cranes 40T cap.

Previous Projects:
April 2013 to Jan 2014- Erection Site manager Baku Ship Yard - Azarbeijan
One Goliath crane 300T x 80m, two Jib Cranes 25T x 40m
September 2012 to Jan 2013
Erection manager for two Ship to Shore Container handling cranes in Visakhapatnam
Port,
Province Andra Pradesh, India

Past Clients:
SPX Cooling Technologies Brussels-Belgium,  Jan 2011 to August 2012: 
Consultant at Central Termoelectrica RIO TURBIO, 2 x 120 MW, 2 ACCs, 
in Santa Cruz province, Argentina, South America

SPX Cooling Technologies (Beijing-China) Co., Ltd.  April 2010 October 2010:
Consultant & Site manager at XinAn Power Plant 2 units 330 MW ACCs, Henan province, China
SPX Cooling Technologies Ratingen/Germany
August 2009 /Feb 2010
Severn Power Station, near Newport -Wales: Construction supervision
ACC Air - Cooled - Steam Condenser for 824 MW gas-fired turbines, United Kingdom

KONECRANES Heavy Lifting Corporation, Finland www.conecranes.com

June 2008 to March 2009
Consulting Eng.
Erection, Sea-transportation and Start up of 32T Grab Ship Un loader for Port Koper, Slovenia. Crane was erected in Greece and transported to its final destination-Port Koper-Slovenia with barge in August 2008.
SPX Cooling Technologies Ratingen/Germany Jan. to May 2008
Pearl GTL Project, Erection Consulting Eng., 8 units ACC, Doha, Qatar
LANGAGE Energy Center, 800 MW ACC Air-cooled Steam Condenser, United Kingdom
SPX Cooling Technologies (Beijing-China) Co., Ltd. July to Dec. 2007
TONGCHUAN Power Plant: Natural Draft Cooling Tower Equipment installation works.

Leighton Contracting (Qatar) W.L.L.  May 2007 to June 2007
Structural Steel Superintendent - Al Shaqab Equestrian Centre, Doha, Qatar

PT Leighton Contractors Indonesia, April 2006 to May 2007
Senior Inspector,
at Bakrie Construction Co., Sumuranja, Merak, West Java, INDONESIA. Fabrication of 5.200 Ton of steel structures for Port Hedland Marine Works Contract - AUSTRALIA, www.leightonasia.com
Montavar MetalnaNova Co.
July 2004 to April 2006
October 2005 - April 2006; Montavar MetalnaNova Co.www.montavar.si. Port of Astakos - 3 pcs. 50 T cap., Ship to Shore Container Cranes, Erection Consulting eng. for C. ROKAS S.A., www.rokasgroup.gr Athens, Greece.
Montavar MetalnaNova Co. Year 2005
Port Koper- Konecrane Container Crane Erection www.luka-kp.si Erection manager; Crane structure was fabricated mainly in MONTAVAR MetalnaNova Co. in Maribor-Slovenia and delivered to Port Koper, and Erection manager - of Cement process plant Anhovo web: www.salonit.si.

Impol-Inotechna Co. Slovenia
Start Date: April 2002 to July 2004
Position/Title: Erection department manager/ Project manager
Responsibilities/Achievements: Project QA QC management, coordination with Clients, Contractors and Sub Contractors in all fields- Fabrication and Erection of  Furnaces and equipment for Aluminium and other process Plants. Site Erection manager of Aluminium Mills (3pcs) at IMPOL d.d. Co., Equipment supply by ACHENBACH Germany. www.achenbach.de
KOCH Gmbh Germany/STT Co.  www.kochtrans.com
from Jan 2001 to March 2002, Kuala Lumpur and Manjung PP-Malaysia
Position/Title: Project manager, Superintendent,
Responsibilities/Achievements: Site production QA- QC management, coordination with Client, Contractors and Sub Contractors in all fields of Fabrication and Erection of Gantry Cranes.... (apx.2000 metric tons of equipment fabricated localy in Kuala Lumpur,... Malaysia).
**************************************************************************************
Up to Year 2000
Year 2000 Jan to Dec.:

Mascom Co. Slovenia (Jan.-Dec. 2000)
Maribor, Vrhovo,- Slovenia
Position: Site Survey Works, Technology, Erection superintendent.
Equipment: Paper Mill industry, Hydro-mechanical Equipment Renovations,..
Work on Project Site: 9 months
Year: 1997-99
Project name: ICRMT-Illinois Central Rail Marine Terminal USA
Location: USA-Louisiana-(working for Connex Austria/Metalna ECCE Co. Austria)
Equipment: Gantry type ship Unloader & Loader (1500T/h, 2000T/h)
Position: Site survey works, technology, Erection in Koper-Slovenia Supervisor, Roll off and Finalization at ICRMT Dock superintendent.
Work on Project Site: in Slovenia port of Koper 4 months, at ICRMT's dock Luissiana-USA, with interruptions 10 months
Year: 1995-1997
Project name: ASD-Alabama State Docks USA
Location: (USA-Alabama-working for ConnexAustia /Metalna ECCE)
Equipment: Gantry type ship Unloader (1500T/h)
Position: Site survey works, technology, Erection in Koper-Slovenia Supervisor, Roll off and Finalization in Port of Mobile superintendent / Manager.
Work on Project Site: in Slovenia port of Koper 5 months, at port of Mobile - 8 months,
Year: 1994-1995
Project name: Container Cranes Kunz-Krems (Austria),
Location: Metalna Co.-Slovenia
Equipment: Crane steel structure factory fabrication
Position: factory fabrication technical project manager
Work on Project: at home office 8 months, at site 1 week,..
Year: 1993-1994
Project name: Willi Becker program of ship rudder blades and trunks (Germany),
Location: Metalna Co.-Slovenia
Equipment: Ship Rudder Blades and Trunks (largest 3 pcs., each 100 Tons)
Position: At Factory- Fabrication Technical Project Manager
Work on Project: at home office 10 months
Year: 1992-1993
Project name: HEP Bhumibol
Location: Thailand-(working for Metalna & Metalna Corporation New York),
Equipment: Penstock fabrication in Bangkok, site pre-assembly at Bhumibol project..
Position: Site survey works, technology, project manager, site sub-contract superintendent and manager.
Work on Project Site: 6 months, at home office 2 months
Year: 1991-92/94
Project name: Hydro Elec. Plant Pak Mun - Thailand
Location: Thailand-(working for Metalna & Metalna Corporation New York),
Equipment: Spillway gates (8 sets), Turbine Intake and Outlet hydro-mechanical equipment,
Position:Preparation of tender, erection technology, site survey, Site Erection Manager.
Work on Project Site: 13 months, at home office 10 month
Year: 1989-90
Project name: Walden North HPS Canada 
Location: (Canada),
Equipment: Penstock and Bifurcation in Metalna Co.- Slovenia and Site erection supervisor
Position: Site survey works, technology, project manager, site sub-contract superintendent and manager.
Work on Project Site: 5 months, at home office 2 months
Year: 1989
Project name: HEP Mahabad Iran,
Location: (Iran),
Equipment: Gates and Penstock- technology preparation for Metalna Co.
Position: Site survey works, technology, renovation study.
Work on Project Site: at site 2 months
Year: 1988-90
Hydro power projects:  Zadlascica, Fala, Vrhovo, other(s)..
Location: (Slovenia),
Equipment: Hydro power plant Projects
Position: Metalna Co. Site survey works, technology, project manager, site superintendent
Work on Project Site: at home office and site total: 16 months
Year: 1988-89
Project name: Derbendi Khan Project,
Location: (Iraq),
Equipment: Renewal of Turbine intake, caterpillar gates and Spillway radial gates, Site inspection and Installation Project Manager
Position: Metalna Co.-Site survey works and technology
Work on Project Site: 2 months, home office 1 year
Year: 1987-88
Project name: Chiew Larn Project Thailand,
Location: (Maribor-Thailand),
Equipment: Pre-assembly of Penstock dia. 11.2m (36.7 ft diameter) x 400m (1312 ft length), 3 pcs. bifurcation, gates & hydro-mechanical equipment,
Position: Metalna Co.-Site survey works and technology
Work on Project Site: at home office 10 months
Year: 1986-87
Project name: Navigation Lock No.1, Iraq,
Location: (Maribor-Iraq),
Equipment: Mitre, Rolling lock gates, Sub-mergible radial gates, Site superintendent
Position: Metalna Co.-Site survey works and technology
Work on Project Site: 1 month, at home office 6 months
Year: 1985-86
Project name: HEP Blanda,
Location: (Iceland),
Equipment: Gates and Penstock dia. 4/3.4m (13/11 ft) x 560m (1830 ft length) with bifurcation- installation technology preparation
Position: Site survey works, technology, project manager, site superintendent
Work on Project Site: at home office 10 months
Year: 1984
Project name: HEP Aswan II,
Location: (Egypt),
Equipment: Gates installation technology preparation
Position: Erection method preparation at Metalna office
Work on Project: 13 months at home office
Year: 1983-84
Project name: HEP Haditha, Iraq,
Location: (Iraq),
Equipment: Pre-assembly of Penstock dia. 11.3m (437 ft diameter) x 97m (318 ft length) x 2 sections, hydro mechanical equipment..
Metalna Co.-Storage area, Pre-assembly penstock and transportation Manager.
Work on Project Site: 13 months
Year: 1982-84
Project name: Uranium Mine & Plant Zirovski Vrh, Slovenia 
Location: (R. of Slovenia),
Equipment: Processing equipment installation
Position: Erection Site assistant and later Site manager for Metalna Co.
Work on Project Site: 1 year 6 months
Year 1980-1981 - Project name: HEP Caplina, Croatia 
Location: R. of Croatia
Equipment: Penstock, gates, site fabrication and installation
Position: Works at Erection Site
Work on Project Site: 2 months

 

ALWAYS:
UnderConst

KONECRANES Pelindo-III Indonesia
TELUK LAMONG THERMINAL 2014-15

KONECRANES BAKU Ship Yard
Goliath erection;

KONECRANES - Visakha Container Terminal Pvt Ltd. (Two 41T STS Cranes)
KC_India
XinAn - China ACC - SPX Co.

Xin An Acc China SPX
Neport ACC
Newport Acc
Langage UK ACC
Langage ACC

Port Kylini Greece -Grab Ship Unloader for Port Koper
Unloader Greece
Huaneng Tongchuan Power Plant
CHINA 2007

Leighton Contracting Qatar
Al Shaqab Equestrian Centre 2007:

Qatar GTL project

PT Leighton, Indonesia

Bakrie Fab Shop
Port Headland
Marine Project 2006/7

Port Headland

Greece- Astakos Port 2005/6:
Astakos Cranes

Montavar Metalna Nova Co.:Metalna Co.

Port Koper Slovenia:
Port Koper crane
Cement plant Slovenia:
Anhovo plant
Aluminum Mills- Slovenia:
Metalna

 

LBT Terminal
Manjung PP-Malaysia:
Lakir Crane Boom

ICRMT-Luissiana, USA:

Luisiana Cranes

Alabama State Docks USA:Alabama Crane

Hydro Power Plant Pak Mun Thailand:
Pak Mun Thailand

Some photos from 1979 to 2002:


Professional Memberships & Education:

Year 2006, Institution: United States of America - American Academy of Project Management: Chartered International Project Manager and Fellow of the American Academy of Project Management.
Year 2004, Institution: Republic Slovenia (Official Gazette of RS No. 110/02, Chamber of Engineers (Official Gazette RS No.123/03) Certificate No. 07038, to certify that I am Registrated in Slovenian Chamber of Engineers and I have ocupied the status of CERTIFIED ENGINEER in the field of MECANICAL ENGINEERING (with ID Stamp No. S-9151) and I am entitled to act as:
* responsible project designer for mechanical installations and equipment for demanding, less demanding and simple structures,
**responsible auditor for demanding, less demanding and simple structures. Certificate dated 27 August 2004.
Year 1987, Institution: Mech. Eng. Register of Republic Slovenia,:
City/Country: Ljubljana/Slovenia/Europe.
Qualifications: Mechanical field (Technology), register no. 77/87, with the Republican Chamber of Industry and Construction, Ljubljana, Slovenia.
Year 1979, Institution: Mechanical engineering School, Maribor, Slovenia
Qualifications: Mech. technician

Year 1973, Primary school; (1-7 class) in Maribor , except for the eight class, which I completed at TARBELA Joint Venture International School - American section, in West Pakistan.

Computer Skils: Auto Cad, Adobe Image Ready, Corel DRAW , Paint Shop Pro, Photo-Paint, Photoshop, Lotus Notes, MS Project, MS FrontPage (this web site!), MS Excel, MSMail, MS Outlook, MS Outlook Express, Windows95.. Windows XP,  MS Office, Adobe Acrobat, Adobe, MS PowerPoint, MS Front Page and other... 
Languages:
English: Spoken Level - Fluent, Written Level - Fluent,
German: Spoken Level - Fluent, Written Level - Basic,
Slovene: Spoken Level - Fluent, Written Level - Fluent,
Croatian: Spoken Level - Fluent, Written Level - Fluent,
French: Spoken Level - Basic, Written Level - None.
International Driving License: Category: B, and Chinese Driving Licence
Desired work: Work Type: Full Time or Contract/Temporary Location- Prefer: Asia, Pacific Islands;  Industry Type: Construction, Consulting, Engineering, Executive Manufacturing/ Industrial / QA-QC,.....
Interests:
Travel, Computers, Electronics....
References: As per this web page, on request.

Marjan Mencinger

In the past years of my carier I have through the years developed the ability to work in different Countries and parts of World successfully, be it independently or as part of a larger team. The skills and expertise obtained in EUROPE, USA, Middle East and ASIA region over the past years ideally place me for my next move into a leading entity.
Google Logo


WWW www.mencinger.biz

 

PM Certificate
 CIPM Certificate
 American Academy PM
 AA FAAPM Logo
 Certificate No. 07038  IZS Certificate